PROJECTS
Projects
Feasibility Predesign Design
![Wastewater Becomes a Wetland Wonder - Western Acres, Prince George, BC](https://www.radloffeng.com/uploads/_CGSmartImage/img-b95c44b4968c7bb4d4c1ee3ff0ff248d.png)
Wastewater Becomes a Wetland Wonder - Western Acres, Prince George, BC
Western Acres is an engineered wetland, meaning it was adapted to accommodate the wastewater system.
![Stellat'en Lagoon Upgrades](https://www.radloffeng.com/uploads/_CGSmartImage/img-f977981bb312eaf2aa101cde87d86347.jpg)
Stellat'en Lagoon Upgrades
Exploring evapo-transpiration solutions for an overloaded lagoon & wetland wastewater system.
![Valemount Affordable Housing Sites Plan](https://www.radloffeng.com/uploads/_CGSmartImage/img-0774e79929b5f1c3201ec90a6ea75bc8.jpg)
Valemount Affordable Housing Sites Plan
Radloff assessed three potential sites for the development of affordable housing.
![Inland Kenworth Design and Development](https://www.radloffeng.com/uploads/_CGSmartImage/img-d67c053d30c6d19a80346b9b9681e0e0.jpg)
Inland Kenworth Design and Development
Radloff's contribution to this $20 million project consisted of subdivision design, rezoning support, and detailed site design for the new dealership.
![Pioneering Self-Sustainability - Kwadacha's BioEnergy Plant](https://www.radloffeng.com/uploads/_CGSmartImage/img-a0df8b349a84cdfe1695157328998a2f.jpg)
Pioneering Self-Sustainability - Kwadacha's BioEnergy Plant
In conjunction with the BC Bioenergy Network, Radloff prepared a feasibility study and design of the first off-grid BioEnergy system in North America.
![Courtyard Marriot - Revitalizing Downtown Prince George Through Economic Development](https://www.radloffeng.com/uploads/_CGSmartImage/img-732896d10b125784c1caa1a42a2ea3e3.jpg)
Courtyard Marriot - Revitalizing Downtown Prince George Through Economic Development
Radloff provided rezoning assistance, design development, and construction supervision of the 6-storey, 174-guestroom Courtyard by Marriott Prince George.
![Protecting Fraser Lake: Developing a Regional, Long-Term Waste Management Strategy](https://www.radloffeng.com/uploads/_CGSmartImage/img-9cd972b3e0be3ff079318c0f7d42089f.jpg)
Protecting Fraser Lake: Developing a Regional, Long-Term Waste Management Strategy
In order to protect their water sources from potentially adverse effects of wastewater and to create a healthy environment, these two communities have asked Radloff to develop a long-term waste management strategy.
![McBride Wastewater Treatment Upgrade - A Big Thumbs-Up for the Environment](https://www.radloffeng.com/uploads/_CGSmartImage/img-d636acdbfdb8dd0412ca2a0695cc44ce.jpg)
McBride Wastewater Treatment Upgrade - A Big Thumbs-Up for the Environment
Radloff completed a $2.4 million upgrade to the Village of McBride's wastewater treatment systems.